tel

Company News

Shoulv High-strength steel Formwork: Powering Southeast Asia’s Construction Projects in Just 1 Month

Click:93Edit: AdminTime:2026-01-26 16:56:58
Project Highlights:
  • Product: High Strength Steel Formwork (Customized)
  • Location: Southeast Asia (Infrastructure Project)
  • Delivery Time: 1 Month (Fast-track Supply Chain)
  • Material Standard: High-tensile steel for maximum pressure resistance
When a large-scale construction project (over 10,000㎡) in Southeast Asia needed reliable formwork solutions, Shaanxi Shoulv High-strength steel Formwork delivered more than just high-quality products—it delivered unmatched speed and efficiency.
high-strength-steel-formwork-application-in-southeast-asia-construction
From Shaanxi Factory to Southeast Asia Site: 30 Days, Seamless Delivery
In just 1 month, our formwork went from production at Shaanxi Shoulv’s factory to on-site assembly at the Southeast Asia construction site. Thanks to optimized supply chain management we cut the typical delivery cycle by 50%—ensuring the project started on schedule without delays.
steel-formwork-ready-for-shipment-within-one-month
tensile-strength-test-for-shoulv-steel-formwork
Why Shaanxi Shoulv Formwork Transforms Large-Scale Projects
For this 10,000㎡+ project, our High-strength steel Formwork brought 3 core benefits that accelerated progress and reduced costs:
Ultra-Easy Assembly, Faster Progress
Shaanxi Shoulv’s formwork features a modular design with pre-numbered components (marked with codes like “A1-3-4” in the photos). Workers can quickly align and lock panels—cutting assembly time by 40% compared to traditional steel formwork. The project’s construction speed has been boosted by 30% since using our system.
tensile-strength-test-for-shoulv-steel-formwork
Reusable & Cost-Effective
Our high-strength steel formwork can be reused for 300+ cycles (far more than wooden/aluminum formwork alternatives). For this large project, it eliminates repeated purchases of disposable formwork—saving 20%+ on long-term material costs.
Precision & Safety for Large Projects
The formwork’s tight-fit design minimizes concrete leakage, ensuring a smooth, high-quality finish (no need for post-pouring repairs). Its lightweight yet sturdy structure also reduces on-site safety risks—critical for large-scale, high-rise construction.


Partner with Shaanxi Shoulv: Speed, Quality, Cost Savings
From factory to site in 30 days, our high-strength steel  formwork isn’t just a product—it’s a turnkey solution for accelerating Southeast Asia’s construction projects. Whether it’s a 10,000㎡ high-rise or a large residential development, Shaanxi Shoulv delivers results that move your project forward.

Contact Shaanxi Shoulv Today
Elevate your next  construction project with our fast, reliable high-strength steel  formwork solutions.

Have a similar project in Southeast Asia?

Get a customized steel formwork solution and a quote within 12 hours.

Inquire About This Project

ONLINE INQUIRY

Close
Close

Security Code

CAPTCHA